The six main cost drivers
- Metering method: material moisture, flow and target accuracy determine the dosing system.
- Lane count and speed: more synchronized lanes require additional forming, sealing, control and discharge hardware.
- Pouch construction: inner pouch only, bag-in-bag and special cut or seal formats use different stations.
- Control and inspection: sensors, vision, reject logic and traceability increase the control scope.
- Downstream automation: can counting, filling, lidding, labelling and cartoning may be separate modules.
- Testing and validation: product trials, tooling, format parts and acceptance requirements must be defined.
Ask what is included in the quotation
| Scope item | Question to ask | Why it changes price |
|---|---|---|
| Filling system | Which material and fill range is it designed for? | Different dosing hardware and controls may be required. |
| Tooling | Which pouch dimensions and film widths are included? | Format parts and forming sets are product-specific. |
| Output | Is the stated rate per lane or complete system? | Lane balance and downstream capacity affect scope. |
| Outer packaging | Does the quote include outer wrap, can filling or labelling? | Each operation adds modules and transfer equipment. |
| Commissioning | What tests, documentation and support are included? | Factory trials and site work affect project effort. |
Use real process details, not a machine photo alone
A similar cabinet can contain different metering, sealing and inspection configurations. Ask for the machine route and technical table that correspond to the quotation.


Common questions
Why is there no reliable price from a product photo?
The photo does not define the dosing method, tooling, controls, lanes, downstream scope or service included.
What should I send to receive a comparable quote?
Send the material sample or specification, fill weight, pouch size, film, target output, power requirements and complete packaging route.
Is the lowest machine price the lowest project cost?
Not necessarily. Include tooling, trials, integration, installation, spare parts and the production losses caused by an unsuitable configuration.